Industrial
East Legon CNC Steel Fabrication
Precision CNC structural steel fabrication consulting for a complex cantilevered residential structure in East Legon. Advanced SAP2000 structural analysis ensured safety and optimized material usage.
Project Highlights
- Location: East Legon, Accra
- Project Type: Industrial
- Project Duration: 5 months
- Total Budget: GHS 220,000
- Status: Completed